The new Bridge "Genova San Giorgio"
Carlo De Lisi - Acmi
(in lingua inglese)
L. Piano's Project includes concrete pylons and upper steel structures.
The spans were manufactured by Fincantieri on Genoa and raised with strand Jacks owned by Fagioli.
The union of the spans is obtained by assembling large carpentry under the pylons. Elevated and fixed at a height. Technology is the controlled tightening.
Also the anti-seismic supports have problems of tightening in controlled torque in truly critical spaces.
- the ground tightening
- the tightening at height
S 3000 and S 6000 ACMI
HXD120 R. Arms - for space problems and reaction point on anti-seismic supports
HXD60 and W2000 TW check the torque of tue tie rods at the base of the warning signs.
Also the anti-seismic supports have problems of tightening in controlled torque in truly critical spaces.
- the ground tightening
- the tightening at height
S 3000 and S 6000 ACMI
HXD120 R. Arms - for space problems and reaction point on anti-seismic supports
HXD60 and W2000 TW check the torque of tue tie rods at the base of the warning signs.
Leggi tutto
Fonte: Acmi - new Bridge
Mercati: Meccanica
- Fabrizio Riccioni
- Dario Shariati
- ARI Armaturen Italia Srl & C.